Saturday, 28 December 2013

FYP 2 : Week 15 ~ Last Week of FYP

Welcome tmy Last week blog here...T_T...i will miss u...

Week 15 ~ Last week of FYP and Submission of all report to supervisor...........


For the week 15 27/12 ( Friday). This is last week for FYP 2, and also need to submission the draft of final report and progress report to my supervisor. After that, need to do the hard cover and submission of final report to Resource Center.


.........................................................................................................................................

I would like to say Thank You very much to my Supervisor Assoc. Prof. Dr. Amir B. Abas to guide my project and teach me, i learn more knowledge from Dr. Thank You Dr.....^.^....  
========================================================




Thank You reader start from week 1 till week 15........

If anything question just drop your comment here......

Miss U Guys.........Y^.^Y.....

The End of My FYP Blog here......

Tuesday, 24 December 2013

FYP 2 : Week 14 ~ Industrial day

Welcome to my last 2 week blog here...Enjoy it...hehehe...^.^.....

Week 14 ~ Industrial day

For the week 14 20/12 ( Friday ). This week is Industrial day week, need to prepare to present and fight for top 20 also. Place of the presentation at Gemilang Hall and my table number is 47, so time from presentation is start from 9am. Before this is setup all the frame and last test project before present. Figure 1 is finished setup my project.



Figure 1 : Place and Table for setup my project 


For each FYP 2 student, have 2 assesses will come and asses the project. Then my 2 assesses is Mdm. Nur Amalia Bt. Sapiee@ Hamdan and Sir. Azman B. Abdul Aziz@ Yusof. Both of my assesses is electronics department and asking electronic question and technical question. Also my project get select of Industrial and get assess from Mr. C K CHIN as Sales Manager from National Instruments Company.

During the presentation, need to explain more detail about project and explain using poster. After that, demo project to assesses and explain how the project function, then give more opinion about improve and innovate the project. Finally, after presentation need wait until 12.30pm to release result Top 20. Figure 2 is to shown the function of my project.


Figure 2 : Fully function


When release result Top 20, i get into Top 20. So need to present again to Industrial Manager and Engineering and to fight for Top 1, 2 and 3. This is very experience for me to get in Top 20. 






Thanks you to read my week 14 blog here.......

But don't forget to continue to read last week on next page...... 

Enjoy it....^.^.......





Sunday, 15 December 2013

FYP 2 : Week 13 ~ Design Poster and Finalize Project

Welcome to my last 3 week left blog here...hopefully enjoy it....

Week 13 ~ design poster and finalize the function of project.

For the week 13 13/12 ( Firday) is last 3 week. Week 13 is very important to finish all step of project which poster, frame of project and whole function of project. This is because next week is week 14 is Industrial day. For the poster design using software Microsoft office publisher and consists poster is introduction, objective, explanation device, process (blog diagram), result(output graph) and conclusion. Want more detail refer to figure 1 below. 


  Figure 1: Poster to shown detail of Project 


For the week 13 also i was to maked finalize about my project and make sure is function 100%. After that, test the project and to get the result or output from SD card. Then the important part is connection pin to pin, this is because pin of the microcontroller only have 4 pin which is RB0 till RB3 is interrupt pin. The pin RB0 and RB1 is connect to RFID reader, the RB2 is connect to storage switch and RB3 is connect to motion sensor output. Finally, is connect all the connection as figure 2 below.

Figure 2 : Connection of whole device

For the result is recorded is after connect whole the device and start test again. The result is get from SD card, the data is Hex code and need to convert to be decimal code. More detail can refer to figure 3 below.


Figure 3 : result of the project


Thanks for your support my log week 13....

And next week is week 14 also is a last week.....

Hopefully you get more information from my blog here.....Have A Nice Day...







Monday, 9 December 2013

FYP 2 : Week 12 ~ Design storage and LED circuit

WELCOME TO MY BLOG AGAIN....ENJOY IT....^.^...

Week 12 ~ Design storage circuit for my project.

For the week 12 ( 6/12) Friday.....

My project is less the circuit, that is storage circuit is use to save the all database into memory SD card after press the push button. The circuit is design consists few component which is 1x1k resister, 1x push button and smell size straight board. Construct the circuit first step is need to draw the schematic diagram then construct at straight board, put the push button then put the resister connect to GND.

After that, design the LED circuit, this is for to represent the motion sensor is turn ON or OFF and also to shown the motion sensor is function. When turn ON the supply the LED will turn it ON and blinking mean the motion sensor is turn on, and get ready to detect object. For the mode detail is when the LED blinking is motion sensor is turn high and low, if want to let motion sensor need to wait the LED turn OFF, this is because motion sensor is detect always high.

Figure : To shown the circuit




Wahaha.......Finished read my blog....? If Yes......

Don't Forget read week 12 in next page.....


Thanks......^.^......Have a Nice day.....








Sunday, 1 December 2013

FYP 2 : Week 11 ~ FYP Briefing 2

Welcome to my blog week 11 here...hehehe...enjoy it....

Week 11 ~ FYP Briefing 2...........



For the week 11 29/11 ( Friday ). Is given FYP briefing 2 to degree and diploma student taken FYP 2. The briefing 2 set at TTL 1 and start from 4 pm-5p m. For the briefing 2 is handle by Mdm Zabariah Bt. Zakaria and Sir. Shamsul Zahari B Shahidin. The briefing is talk about the project demo preparation, design poster and final report.

Mdm Zabariah Bt. Zakaria explain detail about the project demo preparation to all student taken FYP 2. talk about the Industrial Day is fall on Friday, time is start from 8 am till 5.30 pm, but for degree session is start from 8am till 12.30pm and setup the project and booth is start 8 am till 9 am. Then start 9 am till 11 am is start assessor to asses student project and demo. After that, on 12.30pm is release Top 20 winner list and prepare to present to Industrial Manager. Lastly, start 2.00pm till 5.30pm is diploma session. Mdm also have mention again project presentation or demo is 35%. 

 Sir. Shamsul Zahari B Shahidin explain detail about how to design poster and how to present during industrial day. The poster Sir mention few important topic compulsory which is introduction, objective, methodology, result and conclusion. After that, Sir also have mention about colour of poster and format of poster. Also talk about submission form, metadata form and colour of hard cover that have 2 type colour one is dark green is for diploma and dark blue is for degree. Lastly, is talk about step of claim form of project, for the diploma max get claim is RM300 and degree max get claim is RM 500 only. After that, talk about project submission form is need to verify of supervisor and comment of supervisor.






Sample poster and Format poster


Thanks for read my blog week 11.....

But don't forget to continuous to read week 12 next page....

Hahaha....^.^..... 







Saturday, 23 November 2013

FYP 2 : Week 10 ~ Test the project and finished the frame door

Welcome again to my blog here....So far week 10 now...^.^....

Week 10 ~ Test the hardware and during the frame door Supervisor office.

For the week 10 22/11( Friday). for the week 10 i very near for FYP project presentation, still have 4 week left, so test the hardware and bring the complete frame door to my Supervisor office to test the hardware and construct the frame door.

During the test the hardware, need make sure the connection between RFID reader and Controller. Very important is Pin VCC and Pin GND because if mistake to connect the controller hardware IC will be broke.
After that, wiring the motion sensor at top at the door, then the controller and the reader will put at the table.

Concept test the hardware is start from when the student scan the ID card at RFID reader, then the reader will transfer the data to controller will have control the LCD to display the date and time. After that, the controller will save the date and time at EEPROM memory. Then controller will turn On the motion sensor, waiting the student to across the door. After, student the across the door the motion sensor will detect the object, sent the data to the controller and controller will going to save the database into the mirco SD card. Lastly, take out the mirco Sd card put into the laptop the open the file as MIKRO00A to check attendance student date and time from the database.

For the first time test the program and the hardware, the program is working complete and the hardware also, but the problem is waiting time around 20s to turn On the motion sensor and that is too long time to use. After that, after detect from motion sensor also have to wait around 10s to save the database into the micro SD card. So need to change the time to be short and faster.

Refer the figure 1 to more detail about the hardware.




Refer to figure 2 to more detail about the frame door.
Figure 2 : frame door


Thanks to view and read my blog here.....

Remember forget to continue to read following week....

Have a nice day and happy forever.....^.^....







Saturday, 16 November 2013

FYP 2 : Week 9 ~ Discuss with Supervisor Structural of the project.

Welcome to my Blog here.....hahaha...Enjoy it...

Week 9 ~ to discuss with Supervisor the structural of the project.

For the week 9 15/11 (Firday). I suggest the structural of the project as a frame door, this is because my project is student attendance system. Then the consent of the project is when a student using the id card to scan the RFID reader, the RDIF reader will receive the date from the student. After that, the date will sent to the controller system and display the touch screen button to touch. And then, the date will save into EEPROM such as micro SD card after student across  the motion sensor. Lastly, can check the ID code from the student, date and time to scan.

So supervisor also agree my idea, and i will going to using the frame door material is PVC make it to be like a door shape. And the motion sensor will into the center door, easy to detect the student after scan the card. Refer the figure 1 to under more detail.


Figure 1 : Structural of PVC


Thank you to read my blog here, hehe...

Remember to read week 10....hehehe

Have a nice day......Gambateh......